Success Stories | Space Thermal Engineering Projects | Nitrexo

Real missions, real results. Here’s how Nitrexo’s thermal engineering expertise has supported some of our clients’ most demanding space programmes, from concept through launch.

Airbus Defence and Space Netherlands

Sentinel-5P / TROPOMI — Thermal design study for the TROPOMI instrument, successfully launched October 2017 and now used to detect methane leaks worldwide.

Read the full story →

Mullard Space Science Laboratory

Solar Orbiter / SWA-EAS — Thermal control system design for the SWA-EAS instrument, successfully launched and having completed its first close pass through the Sun’s corona.

Read the full story →

Thales Alenia Space

SATCOMBw (COMSATBw-1 & 2) — Thermal Balance/Vacuum test predictions and correlated thermal models for the German Armed Forces’ satellite communication system. Both satellites successfully launched.

Read the full story →

Want to explore more of our engineering work? Take a look at our technical case studies, or get in touch to start your own success story.